Home > Network > Narlı to Karkamış

Narlı Karkamış


This line was opened in 1960, much later that the relative lines in the same area. The main intent were twofolds:

  • serve the important city of Gaziantep which was not linked to any railway and which is now one of the biggest city in Turkey.
  • provide a link to Karkamış and beyond without entering Syrian territory, fixing a cumbersome working that lasted since 1918.

Although not in flat terrain, the line was built in a landscape of hills which are about 200-300m above the plateau and did not present any major engineering challenge. From Narlı, the line is parallel to the Malatya line for about 6,5km, before making a turn right to take almost southward heading to Gaziantep. At Salmanlı, 20km after Narlı, the line will have gained about 200m in altitude. From there, the line will wind around the hills and climb gently to 900m arriving in Gazitantep.

KmStationComment
0NarlıTurning loop for direct connection to Malatya
7,3DehlizburnuHalt
20,6Salmanlı 
24,8KonakobaHalt
27,8KeleşHalt
39,2Akçagöze 
59,0Şehitarif 
71,6Dülük 
75,5BeylerbeyiHalt
84,0GaziantepMain station
89,3Mustafayavuz 
100,2HayratHalt
114,6Türkyurdu 
121,3Yuva 
133,4Nizip 
141,5BozalioğluHalt
144,5BağlıcaHalt
147,7TilmiyenHalt
153,5Yeşildağ 
156,0BayındırHalt
159,0KumlucaHalt
161,1ElifoğluHalt
165,5TosunlarHalt
169,5TürkburcuHalt
174,9KarkamışJunction with the lines Karkamış to Nusaybin and Çobanbey to Karkamış
line-narli-karkamis