Narlı Karkamış
- OpenStreetMap location
- Length: 174,9 Km
This line was opened in 1960, much later that the relative lines in the same area. The main intent were twofolds:
- serve the important city of Gaziantep which was not linked to any railway and which is now one of the biggest city in Turkey.
- provide a link to Karkamış and beyond without entering Syrian territory, fixing a cumbersome working that lasted since 1918.
Although not in flat terrain, the line was built in a landscape of hills which are about 200-300m above the plateau and did not present any major engineering challenge. From Narlı, the line is parallel to the Malatya line for about 6,5km, before making a turn right to take almost southward heading to Gaziantep. At Salmanlı, 20km after Narlı, the line will have gained about 200m in altitude. From there, the line will wind around the hills and climb gently to 900m arriving in Gazitantep.
Km | Station | Comment |
---|---|---|
0 | Narlı | Turning loop for direct connection to Malatya |
7,3 | Dehlizburnu | Halt |
20,6 | Salmanlı | |
24,8 | Konakoba | Halt |
27,8 | Keleş | Halt |
39,2 | Akçagöze | |
59,0 | Şehitarif | |
71,6 | Dülük | |
75,5 | Beylerbeyi | Halt |
84,0 | Gaziantep | Main station |
89,3 | Mustafayavuz | |
100,2 | Hayrat | Halt |
114,6 | Türkyurdu | |
121,3 | Yuva | |
133,4 | Nizip | |
141,5 | Bozalioğlu | Halt |
144,5 | Bağlıca | Halt |
147,7 | Tilmiyen | Halt |
153,5 | Yeşildağ | |
156,0 | Bayındır | Halt |
159,0 | Kumluca | Halt |
161,1 | Elifoğlu | Halt |
165,5 | Tosunlar | Halt |
169,5 | Türkburcu | Halt |
174,9 | Karkamış | Junction with the lines Karkamış to Nusaybin and Çobanbey to Karkamış |